Production and consumption

Production63,373 MW
Nuclear · 70.5 %44,674 MW
Wind · 13.2 %8,392 MW
Hydro · 11.4 %7,206 MW
Gas · 4.2 %2,679 MW
Other · 1.1 %703 MW
Oil · 0.1 %41 MW
Coal - Cons. · -0.0 %-1 MW
Other - Cons. · -0.0 %-2 MW
Hydro - Cons. · -0.5 %-318 MW
Consumption51,841 MW
Excess 11,532 MW

Last Updated: 2026-11-21 22:00

Production - FR - Yesterday and today

…

Net production - FR - Yesterday and today

…

Electricity price per month - FR, France

…

The table below presents the average price for the electricity area FR in France, monthly since 2021. Note that the latest month might be incomplete.

The electricity price shown in the table is based on the following formula: ([spot price] + (fees)) * (tax). This is adjusted according to your current settings.

The electricity price in the table represents the current spot price. Keep in mind that additional fees and taxes may apply. You can choose to display either the spot price or the actual price through the settings on the page.

Operational Disruptions in France

4Ongoing Planned
0Ongoing Unplanned
0Upcoming

Below you can see the current operational disruptions affecting the electricity production in France.

Planned Maintenance – HAVRE 4 2021-04-01

HAVRE 4 FRANCE is affected by a planned maintenance that starts 2021-04-01 and is estimated to be completed 2027-12-31.

Capacity during the outage: 0.0 MW

Total capacity: 580.0 MW · Fossil Hard coal

Planned Maintenance – FESSENHEIM 2 2020-06-29

FESSENHEIM 2 FRANCE is affected by a planned maintenance that starts 2020-06-29 and is estimated to be completed 2099-12-31.

Capacity during the outage: 0.0 MW

Total capacity: 880.0 MW · Nuclear

Planned Maintenance – FESSENHEIM 1 2020-02-22

FESSENHEIM 1 FRANCE is affected by a planned maintenance that starts 2020-02-22 and is estimated to be completed 2099-12-31.

Capacity during the outage: 0.0 MW

Total capacity: 880.0 MW · Nuclear

Planned Maintenance – CYCOFOS TV2 2018-03-25

CYCOFOS PL2 France is affected by a planned maintenance that starts 2018-03-25 and is estimated to be completed 2034-08-31.

Capacity during the outage: 0.0 MW

Total capacity: 62.0 MW · Other