intra_zonal is affected by a planned maintenance that starts 2026-01-01 and is estimated to be completed 2027-01-01.
Capacity during the outage: 2018.0 MW
Total capacity: 2142.0 MW · Hydro Pumped Storage
| Production | 54,164 MW |
|---|---|
| Wind · 47.3 % | 25,645 MW |
| Gas · 21.3 % | 11,556 MW |
| Coal · 18.5 % | 10,035 MW |
| Other · 10.2 % | 5,507 MW |
| Hydro · 2.4 % | 1,318 MW |
| Oil · 0.6 % | 300 MW |
| Hydro - Cons. · -0.4 % | -197 MW |
| Consumption | 54,897 MW |
| Deficit | -732 MW |
Last Updated: 2026-11-21 22:15
The table below presents the average price for the electricity area DE-LU in Germany, monthly since 2021. Note that the latest month might be incomplete.
The electricity price shown in the table is based on the following formula: ([spot price] + (fees)) * (tax). This is adjusted according to your current settings.
Below you can see the current operational disruptions affecting the electricity production in Germany.
intra_zonal is affected by a planned maintenance that starts 2026-01-01 and is estimated to be completed 2027-01-01.
Capacity during the outage: 2018.0 MW
Total capacity: 2142.0 MW · Hydro Pumped Storage