KW Theiß M5 intra_zonal is affected by a planned maintenance that starts 2026-01-01 and is estimated to be completed 2027-01-01.
Total capacity: 240.0 MW · Fossil Gas
| Production | 4,858 MW |
|---|---|
| Wind · 40.5 % | 1,968 MW |
| Hydro · 38.7 % | 1,882 MW |
| Gas · 25.0 % | 1,213 MW |
| Other · 8.1 % | 394 MW |
| Hydro - Cons. · -12.3 % | -598 MW |
| Consumption | 6,835 MW |
| Deficit | -1,976 MW |
Last Updated: 2026-11-21 22:30
The table below presents the average price for the electricity area AT in Austria, monthly since 2021. Note that the latest month might be incomplete.
The electricity price shown in the table is based on the following formula: ([spot price] + (fees)) * (tax). This is adjusted according to your current settings.
Below you can see the current operational disruptions affecting the electricity production in Austria.
KW Theiß M5 intra_zonal is affected by a planned maintenance that starts 2026-01-01 and is estimated to be completed 2027-01-01.
Total capacity: 240.0 MW · Fossil Gas
KW Theiß M3 intra_zonal is affected by a planned maintenance that starts 2026-01-01 and is estimated to be completed 2027-01-01.
Total capacity: 255.0 MW · Fossil Gas
Lau GuD intra_zonal is affected by a planned maintenance that starts 2026-01-01 and is estimated to be completed 2027-01-01.
Total capacity: 140.0 MW · Fossil Gas
Lau GuD intra_zonal is affected by a planned maintenance that starts 2026-01-01 and is estimated to be completed 2027-01-01.
Capacity during the outage: 28.0 MW
Total capacity: 140.0 MW · Fossil Gas
Limberg III TU 1 intra-zonal is affected by a planned maintenance that starts 2026-01-01 and is estimated to be completed 2026-12-02.
Total capacity: 240.0 MW · Hydro Pumped Storage